Skip to content

Request a proposal

Tell us your name, how to reach you, your town, the project and roughly when. That's enough to start. We'll contact you the way you choose. If it's a fit, Rick visits for free. Then come a design phase, with a fee based on the size of the project, plans with a hard quote, and a detailed proposal.

Prefer to talk? (508) 840-4077

Five short questions

How to reach you (required)

Phone or email. We just need one way to reach you.

What are you planning? (required)

When would you like to start? (required)

By sending this, you're asking Guild Design Build to contact you about your project. We won't sell your information. Privacy policy

Not ready to ask yet?

That's fine. Two pages answer the first questions most people have: Check if an ADU fits your lot (free) and see what projects cost on Cape Cod. Come back when you're ready. The form will be here.

More about not ready to ask yet
  • Thinking about an ADU or in-law space? The feasibility check walks through the state size rule, septic, flood zone and your town's rules, and tells you what to check first. See also ADU or in-law addition?.
  • Trying to set a budget? The cost guide collects published third-party ranges, each with its source and date. They aren't our prices.
  • Want to see our work first? Browse our projects or read what homeowners say.
  • Own a second home and live off-Cape? Start with renovating a second home.

What happens after I send the form?

  1. You'll see a confirmation on screen, and we'll email you a copy of what you sent. You can add more details then, or skip it.
  2. We read it and get in touch the way you asked: call, text or email. We'll get back to you as soon as we can. We're working hard on every client's project, and we'll be in touch soon.
  3. A short first conversation: what you want, your timeline, your budget range, and whether we're the right fit.
  4. Free site visit. Rick walks the property and looks at the job, with you or with your caretaker or property manager. Not on the Cape? We can start with a video walkthrough of your home.
  5. Design phase. There's a design fee based on the size of the project.
  6. Plans and a hard quote. Design plans get drawn, and subcontractors bid so the job is hard-quoted.
  7. A detailed proposal. It includes the cost of the architectural and permit drawings the town needs to approve the job.

What you get: a straight answer on whether the project fits your lot and your town's rules, then a written proposal you can compare side by side with other builders'.

More about what happens after I send the form
  • Steps 1–3. If your project isn't something we do, like a deck or a porch on its own, we'll say so and point you somewhere useful. Decks and porches are handled at capecodcarpentryguild.com (opens in a new tab).
  • Step 4, the site visit. On older Cape houses, what's behind the walls drives the job. On our full-gut remodel in Yarmouth Port (opens in a new tab), the house was "a tired, dated structure that had run its course," and the job became a full gut, level 3 alteration. We'd rather know that at the first visit than after the price is set.
  • Before design. On the Cape, four things decide most projects: how many bedrooms your septic system is approved for, your town's zoning and the state ADU rules, whether you're in a FEMA flood zone, and whether the work is near a wetland. If one of those is a hard limit, you'll hear it before you pay for a full design. The full walk-through is on How design-build works.
  • Steps 6 and 7, the hard quote and the proposal. Because subcontractors bid on the finished plans, the price is a hard quote, not a guess. The proposal should spell out the work, the materials, the total price, the payment schedule, and the start and finish dates. Those are the same things Massachusetts requires in a home improvement contract (M.G.L. c.142A §2). How long a proposal takes depends on the project. A bathroom is quicker than an ADU that needs septic and zoning answers first.

Does asking for a proposal commit me to anything?

No. Sending the form just starts a conversation. You don't sign anything or owe anything for asking. Nothing gets built until there's a written contract that you've signed and have a copy of.

More about does asking for a proposal commit me to anything

Massachusetts law says a home improvement contract over $1,000 has to be in writing, and that "no work shall begin prior to the signing of the contract and transmittal to the owner of a copy" (M.G.L. c.142A §2). The state's own advice to homeowners is to talk to at least three contractors and ask each for a written, detailed estimate (mass.gov, HIC Homeowner Resources). We think that's good advice. Compare us side by side.

After the free site visit comes the design phase, with a design fee based on the size of the project. The ADU feasibility check is free.

What should I have ready?

To start, you only need your name, a phone or email, your town, the project and roughly when. The rest helps us come prepared, so add it after you send the short form if you have it.

  • The property address
  • The type of project (ADU, in-law addition, gut renovation, addition, bathroom)
  • A rough size, and whether you're adding a bedroom
  • Your timeline, plus any hard deadline
  • A budget range
  • Photos of the house and the area you want to change
  • Your septic or Title 5 inspection report, if you have one
  • Any plot plan, survey or drawings you already have
More about what should I have ready
  • Address. Every Cape town has its own boards and bylaws. The address also tells us whether you're on septic or sewer, and lets us look up your flood zone. FEMA's Flood Map Service Center is "the official public source for flood hazard information" (msc.fema.gov). You can look up your own address there. Not sure? Leave it blank and we'll check.
  • Project type and rough size. "About 600 square feet over the garage" is plenty. For an ADU, the size of your main house matters too. Under the state rules, an ADU can be no larger than half the main home's gross floor area or 900 square feet, whichever is smaller (mass.gov). Towns still apply their own rules on top, so confirm with the town. See ADU rules on Cape Cod.
  • Adding a bedroom? This is the big septic question. MassDEP lists "adding a bedroom to a house" as a change that needs a Title 5 system inspection when the work needs a building permit. Any change to the building's footprint also needs an inspection, so construction doesn't land on the septic system or its reserve area (mass.gov, Buying or Selling Property with a Septic System). See Septic, Title 5 & adding space.
  • Title 5 report. If you bought the house in the last few years, you may already have one. For most systems, the inspector sends the report to the town's Board of Health, and a sale inspection is generally good for two years, or three if the system has been pumped every year and the records show it (mass.gov). An old report won't settle whether the system can take more flow. It still tells us where the tank and leach field are and what shape they were in.
  • Timeline. Tell us about any real deadline, like a parent moving in, a closing date or a summer rental season. That shapes the plan more than anything else.
  • Budget range. See the next section.
  • Photos. Phone photos are fine. Get the outside of the house from each side, the room or area you want to change, the basement or crawlspace if you can, and the septic cover or tank lid if you know where it is.
  • Plot plan, survey or drawings. These are often in your closing papers. If you have none, that's normal. Don't pay for anything new before we talk.

Why do you ask about budget?

A budget range tells us which options are worth designing at all. It doesn't set your price, and we won't design up to the top of your range. If you don't know yet, choose "Not sure yet."

More about why do you ask about budget

We don't publish Guild prices. Every Cape house and lot is different, and a number without a site visit is a guess. If you'd like a starting point, our Cape Cod renovation cost guide collects published third-party cost ranges, each with its source and date. Being upfront about budget is the fastest way to a plan you can actually build.

Is my information kept private?

We use what you send only to answer you about your project. We don't sell it. Text messages are optional. You can say no and still get a proposal.

More about is my information kept private
  • Your address and photos are used to look up public records (zoning, flood maps, septic records) and to plan the visit.
  • Agreeing to texts is a separate, optional checkbox. Under federal rules, written consent to automated marketing calls or texts must tell the person they aren't required to agree "as a condition of purchasing any property, goods, or services" (47 CFR 64.1200(f)(9)(i)(B)). That's why the box is unchecked and not required.
  • Full details are in our privacy policy.

Should I check you out first?

Yes, please. Look us up on the state's HIC registry (#210736), ask to see recent Cape projects, and ask who pulls the permits. We'll answer all of it.

More about should I check you out first

The state's checklist for homeowners includes checking a contractor's HIC registration on the MA Contractor Hub, asking for proof of liability and workers' compensation insurance, and asking for references from recent jobs (mass.gov). The Home Builders & Remodelers Association of Cape Cod also suggests asking for "two or three Cape projects from the last couple of years" and calling those homeowners (capecodbuilders.org). You can see some of our work now:

The registered contractor should pull the building permit. The state warns that if you apply for the permit yourself, "you may not be eligible for compensation from the Guaranty Fund" (mass.gov).

Our registration and license, as the state shows them:

  • HIC #210736: Cape Cod Carpentry Guild Inc., Active, through January 9, 2028 (MA Contractor Hub, checked November 14, 2026).
  • Construction Supervisor License CS-116503: Richard T Conway, Active, through April 27, 2027 (state License Verification Site, checked November 14, 2026).

Frequently asked questions

Does it cost anything to request a proposal?

No. Sending the form costs nothing, the first site visit is free, and neither commits you to anything.

More about this answer: Does it cost anything to request a proposal?

Nothing gets built without a signed written contract. Massachusetts requires one for any home improvement job over $1,000, and work can't start until you've signed it and have a copy (M.G.L. c.142A §2). Next comes the design phase, with a design fee based on the size of the project. Design plans get drawn, and subcontractors bid so the job is hard-quoted. Then you get a detailed proposal, including the cost of the architectural and permit drawings the town needs to approve the job.

How long does a proposal take?

A full proposal takes longer than a quick quote, because on Cape Cod we check septic, zoning and flood rules first.

More about this answer: How long does a proposal take?

We'll get back to you as soon as we can. We're working hard on every client's project, and we'll be in touch soon. A bathroom proposal can come together after one visit. An ADU or addition often needs answers from the Board of Health or the building department before real numbers mean anything. A price given over the phone, before anyone has seen the house or the septic records, is a guess.

Can you give me a ballpark price over the phone?

We don't quote prices before we've seen the house, and we don't publish our prices.

More about this answer: Can you give me a ballpark price over the phone?

We're happy to talk through your budget range on the first call and tell you honestly if it looks tight. For published third-party ranges, see the Cape Cod renovation cost guide.

I don't know if my septic system can handle another bedroom. Should I still ask?

Yes. Most people don't know, and finding out is one of the first things we do. We check it with you, then work with you and your Board of Health on whether the project can go ahead and what your options are. You don't need to hire your own septic designer or engineer.

More about this answer: I don't know if my septic system can handle another bedroom. Should I still ask?

MassDEP lists adding a bedroom as a change that needs a Title 5 system inspection when a building permit is involved. For most systems, inspection reports go to your town's Board of Health (mass.gov). If you have an old report, upload it. If not, choose "Not sure." See Septic, Title 5 & adding space.

I live off-Cape and this is a second home. Can we start remotely?

Yes. The short form, your phone photos and a video walkthrough of your home are enough to start. The free site visit is the first step that needs someone at the property, and we're glad to meet your caretaker or property manager there.

More about this answer: I live off-Cape and this is a second home. Can we start remotely?

After you send the short form, the optional details ask whether you'll be on the Cape during the project, who can let us in, and your main mailing address, so paperwork goes to the right place. Upload photos of each side of the house and the area you want to change. One thing to know: the state says vacation and secondary properties, new construction, and investment properties are not covered by the Home Improvement Contractor law (mass.gov). That affects whether state arbitration and the Guaranty Fund are open to you, so a clear written contract matters even more. See Second-home owners.

Should I get more than one proposal?

Yes. The state recommends talking to at least three contractors and getting a written, detailed estimate from each.

More about this answer: Should I get more than one proposal?

Compare more than price. Look at what's included, who pulls the permits, the payment schedule, and how each contractor plans to handle septic, zoning and flood questions. The state also notes that a contractor can't collect more than one-third of the contract price up front, unless special-order materials are needed (mass.gov).

Do you build decks and porches?

Yes, through our carpentry side. Decks, porches and railings are handled at capecodcarpentryguild.com (opens in a new tab).

More about this answer: Do you build decks and porches?

Guild Design Build focuses on ADUs, in-law additions, major renovations, home additions and bathrooms. If a deck or porch is part of a bigger project, mention it in the project details so we can talk about it with the rest of the work.

What areas do you work in?

Cape Cod, from our base in Pocasset.

More about this answer: What areas do you work in?

Our past project posts include work in Yarmouth Port, Mashpee, Marstons Mills, Chatham, North Falmouth, Pocasset and Wareham (Projects). Town guides: Barnstable · Bourne · Chatham · Falmouth · Harwich · Mashpee · Sandwich · Yarmouth.